Time to start the work on adding detail to the stoves for furnaces E & F. Prior to this all the items were there just about, but all as hodge podge of separate elements. So I adhered everything to a sturdy base and made catwalk/stairway connections, pipe connections, basic fixes to broken parts, and so on. All new items can be seen as either white butyrate tube, white styrene, grey styrene, or brass. The grey styrene tube is the cold blast main which will still have to be connected to each individual stove. That piece came from the Walthers HO Blower Engine House kit as I have 2 of these for the Boiler House # 2 rebuild. The old Boiler House #2 was sold. Hasta La Vista...Baby

( click_to_see_moreCollapse )