March 25th, 2010

Coke By-Products Plant Stage 1

A Coke Byproducts plant built for a client:

Most is kitbashed with the exception of the creme tower which was mainly scratchbuilt. As always contact zahkunst@hotmail.com for custom work inquiries.





click_to_see_moreCollapse )

No. 1 Powerhouse Complete. Next Building.

The No. 1 Power House has been weathered and is completed. The next task is to tackle the open space to the side of it about 24" long. I have envisioned a 20' long brick structure along the same architectural lines as my large machine shop. Only this time it'll have 1 more story but still with the glass clerestory windows above. This way it'll blend in well with the large Blowing Engine House.





Read more...Collapse )

Profile

_nonamenoslogan
---------------------------
Main Model Website

Latest Month

November 2010
S M T W T F S
 123456
78910111213
14151617181920
21222324252627
282930    
Powered by LiveJournal.com
Designed by Tiffany Chow